Upleveled Industries
Capacity diagnostic · free

ShopCapacity

A capacity model for stone fabrication shops. Find the constraint, test the change, then walk the floor.

Shop Saved
My Stone Shop

Today's bottleneck is .

Calculating where your shop's capacity is tightest.
Realistic output
sq ft / week
Jobs / week
estimated
Capacity score
Daily output
sq ft
Weekly output
sq ft
Jobs / week
estimated
Today's bottleneck
Safe range
sq ft / week
Machinery snapshot · capacity by station
Where to focus this week
Loading…
    Labor moves the machine answer
    ShopCapacity stays focused on machine throughput. Crew decisions belong in LaborLogic.

    Schedule changes (4×10 vs. 5×8), tiered production bonuses, piece-rate pilots, and cross-training can shift weekly output as much as new equipment can — but they live downstream of the bottleneck this tool finds. LaborLogic models cost per SF, OT vs. hire vs. shift decisions, and how staffing maps to your constraint.

    Compass bridges the two: when ShopCapacity flags a labor-bound bottleneck, Compass routes it into LaborLogic automatically and pulls back the crew-side answer — so “machine vs. labor” stops being two separate calculators you’re mentally syncing.

    Save scenarios across visits
    Right now this tool resets every time you close the tab.

    Save multiple shop configurations, compare equipment changes side-by-side over months, share read-only views with your team, and track how your bottleneck shifts as you grow — all part of Compass, the subscription tier that pairs ShopCapacity, LaborLogic, and BreakEven with persistent shop data.

    Try a change
    Highest-impact moves for your current bottleneck.
    Capacity by department
    Output range
    Safe
    sq ft / week · 82% of realistic
    Realistic
    sq ft / week · the target
    Stretch
    sq ft / week · 112% — push only short-term
    Department detail
    Bottleneck ranking — tightest first
    Upleveled Industries · ShopCapacity These numbers are a model of your shop, not a promise.
    Use them to spot constraints and test changes — your floor will tell you the rest.
    Talk it through

    Five free minutes with a ULI advisor.

    Bring this page to a call. One of our advisors will look at your bottleneck with you and help turn it into a real next step. No pitch, no commitment — just five minutes with someone who’s worked the same problem on the floor.

    5 minutes No commitment Real shop operators
    Book a 5-minute call